Grand Avenue in Glenwood Springs, Colo., has a grand new thoroughfare.


An aging and functionally obsolete bridge, a nine-span, 676-ftlong steel plate girder bridge constructed in 1953, carried SH82 over Interstate 70, the Colorado River, and Union Pacific Railroad (UPRR) lines before descending into the historic downtown business district of Glenwood Springs. It was one of only two crossings serving Glenwood Springs as well as other communities along the Roaring Fork River valley, including Aspen to the south.


The existing bridge had four roughly 9-ft-wide lanes that had effectively become a bottleneck. The bridge’s structural capacity didn’t meet current codes and it had limited shelf life remaining; simply widening it wouldn’t work. Opposition groups had successfully shut down a previous Colorado Department of Transportation (CDOT) replacement project. This time, CDOT made a concerted effort to improve the process by involving the designer, contractor, and public early in the design.


The project included changing the SH82 alignment over the bridge from straight to curved with a 625-ft radius. The new alignment and proposed intersections at the north end improved traffic flow at the SH82/I-70 interchange but made the new bridge geometrically challenging. The horizontal curvature resulted in the bridge crossing I-70, the river, and the railroad at varying degrees of skew. The north end of the bridge was tangent and required a flaring deck width to accommodate the changing lane requirements near the SH82/I-70 interchange. The profile also required a sharp vertical curve to get up and over the UPRR and then immediately begin the descent into downtown.


The new bridge had two distinct regions with significant variation in the required structure depths. A deeper structure of approximately 7 ft was required for the longer spans over the highway, river, and railroad, but a shallower structure of approximately 3 ft was required for the shorter downtown spans to allow adequate headroom for a planned pedestrian plaza under the bridge.


A five-span trapezoidal steel tub girder bridge using 6-ft deep girders was selected for the deeper, steel portion of the bridge (Unit 1), which included the main spans over the Glenwood Hot Springs Pool parking lot, a frontage road, I-70, the Colorado River, and UPRR. A tub shape with sloped sides provides a clean look, while also paying homage to the many steel and concrete tub/box girder structures supporting I-70 in nearby Glenwood Canyon. Tub girders also provide excellent torsional properties to efficiently handle the sharp curvature of the bridge. The tub girder section was optimized by using a narrower bottom flange (5 ft, 7 in. web to web) than had typically been used in Colorado. This, combined with recent enhancements in AASHTO LRFD Bridge Design Specifications regarding local flange buckling, helped achieve practical bottom flange thicknesses of 2 in. or less without longitudinal bottom flange stiffeners. The increased web-to-web spacing between adjacent tub girders did affect the deck design, but this proved to be relatively inconsequential when compared with an even web spacing.


The originally planned four tub girder lines eventually dropped to three, resulting in fewer members to fabricate and erect and a maximum web-to-web spacing of 18.6 ft at the flared north end of the bridge. In addition, a refined deck analysis led to a reasonable deck thickness and reinforcement in this region. The contractor attached a temporary floor beam/stringer system from the tub girders to form the widest deck spans in the flared region. This proved more cost-effective than adding another girder line, which would have otherwise been required to accommodate standard deck forming systems in the flared region.


The reduction in girder lines also resulted in increased top flange lateral bracing demands, especially in the flared region. After a study comparing Warren and Pratt truss layouts, the team concluded the Pratt truss was most optimal for this bridge. The Warren truss design would have resulted in larger diagonal member forces in compression, which would have required larger diagonal members and the use of gusset plates at the flange connections. By comparison, the Pratt truss allowed strategic changes in diagonal member orientation to balance the member forces in either compression or tension while mitigating the magnitude of the diagonal member connection forces. The result was reasonable diagonal member sizes and direct connections to the top flange, and no gusset plates were needed.


Project Team


  • Steel Fabricator: W&W | AFCO Steel, San Angelo, Texas *AISC MEMBER* *AISC CERTIFIED*

  • Steel erector: Pioneer Steel Inc., New Castle, Colo. *AISC CERTIFIED*

  • Steel detailer: ABS Structural, Melbourne, Fla. *AISC MEMBER*

  • Engineer: RS&H, Inc., Greenwood Village, Colo.

  • General contractor: Granite/RLW Joint Venture, Glenwood Springs, Colo.

  • Owner: Colorado Department of Transportation - Region 3, Grand Junction, Colo.

PRIZE BRIDGE INFORMATION

Year Awarded:

2020

Year Completed:

2017

Location:

Glenwood Springs, Colo.

Award Class:

Medium Span

Award Type:

National Award

STRUCTURE INFORMATION

Structure Type:

Tub Girder

Coating System:

Weathering Steel

Span Length (ft):

169 - 173 - 174.5 - 170 - 94

Structure Length (ft):

783

Average Deck Width (ft):

62

Steel Weight/Deck Area (lb/ft²):

47

Amount of Steel (tons):

1128

130 EAST RANDOLPH, SUITE 2000, CHICAGO, IL, 60601   |     CONTACT US

nsba-logo-180.png

Smarter. Stronger. Steel.

© American Institute of Steel Construction. All Rights Reserved.  terms & conditions

bottom of page
<--feathr--> <--end feathr-->